Brazil Project 1

Engineering and supervision supplied by MB Engineering Services, Clayton Walker Gasholders Ltd. Shell constructed in 22 weeks.


Dcp_0167.jpg

Dcp_0187.jpg

Dcp_0205.jpg

Dcp_0233.jpg

Dcp_0238.jpg

Dcp_0256.jpg
Brazil Project 1 | 2 | 3

M.B. Engineering services Clayton Walker Gasholders Ltd provided engineering and design services, operational supervison for the operation of our jacking system and for the construction of this 80,000 cubic meter capacity Wiggins type gasholder for L.D. Gas.

Client: Compahia Siderurgica De Tubarao
Site: Vitoria. Brazil.
Contractor: Kawasaki
Constructors: Metalmec

Dimensions:- 55.7m diameter.
51.95m to the curb angle.
Total Jacked weight: 1188 tonnes using 130 jacking units
Lift height: 2.5m
Lifting time: 1 hour 40 mins.